bathroom sink

Renovation of a villa in Polo Villas

Project details

Address

David Kakabadze st., 26

Square

120 m²

Property Type

Villa, 3 floors

Type of Repair

Green Frame

Work Term

3,5 month

Number of Rooms

3+1, 2 bathrooms

Project description

StroyEliteGroup has completed a comprehensive renovation of a villa in the prestigious Polo Villas complex in Batumi. This project involved a full interior update and was executed in just 3.5 months, highlighting our ability to efficiently and effectively implement projects of any complexity. We brought all of the client’s wishes to life, creating a modern and functional space for comfortable living.

Stages of work:

  • Floor Screed: We began by leveling the floors, providing the perfect foundation for subsequent finishing stages.

  • Plumbing Work: We completely replaced the plumbing systems and installed modern equipment to ensure reliability and durability.

  • Water-Based Underfloor Heating: We installed a water-based underfloor heating system, which provided even heat distribution and a comfortable indoor climate.

  • Electrical Work: We upgraded the electrical wiring, optimally placing outlets and switches for convenient use.

  • Wall Plastering: We plastered the walls to create a perfectly smooth surface, ready for further finishing.

  • Wall Spackling: Spackling the walls prepared them for painting by eliminating all minor imperfections.

  • Wall Painting: We used high-quality paints to create a durable and aesthetic finish that matched the chosen color palette.

  • Tiling Work: We laid tiles in the bathrooms and kitchen, ensuring durability and a stylish appearance.

  • Installation of Heating and Air Conditioning Systems: We equipped the villa with modern heating and air conditioning systems to ensure comfortable living at any time of year.

  • Door Installation: We installed new interior and entrance doors that harmoniously fit the overall style of the interior.

  • Kitchen Design and Installation: We developed a custom kitchen design and carried out its installation, integrating modern solutions for convenience and aesthetics.

  • Decorative Wall Plaster: We used decorative plaster to add uniqueness to the interior and create a special atmosphere.

  • Stretch Ceilings: We installed stretch ceilings, which concealed utilities and gave the space a modern look.

  • Staircase Installation: We installed a staircase, ensuring convenient and safe transitions between floors.

Gallery

Leave a request for a call back

Fill out the form below, after which we will call you back as soon as possible